Driveways & Patios
Floors & Foundations
Floors & Flatwork
Sites & Facilities
Floors & Coatings
Facilities We Serve
Ardex · Waterproofing
Keeping Water Out of Las Vegas Concrete Structures
Basements, plaza decks, and wet rooms need membranes that stop water before it reaches the slab. Ardex waterproofing systems are engineered for Las Vegas conditions, and we install them as a complete assembly: substrate prep, primer, membrane application, and protection layers all working together. Free written estimate on every project.
- Certified Ardex installer
- Complete system protocol
- Written quote, firm timeline
Why systems work
Waterproofing Succeeds When Every Layer Plays Its Role
A membrane alone is not waterproofing. The primer bonds the membrane to the substrate. The protection layer shields the membrane from backfill, foot traffic, or equipment during construction. The joint detail handles movement and transitions where water finds gaps. Remove any one piece and the system fails.
Ardex designs each component to work with the others, and the warranty covers the full assembly only when installed per spec. We follow that protocol because it is the only way to deliver decades of dry concrete.
Our full Ardex range includes repair mortars for substrate prep and self-leveling underlayment for floor flatness. When waterproofing is part of a larger basement renovation, we coordinate all the concrete work.
Installation sequence
How Ardex Waterproofing Gets Installed
-
Assess and specify
We evaluate the substrate, exposure conditions, and protection requirements to select the right Ardex system (below-grade liquid, plaza deck sheet, wet-room assembly, or balcony membrane).
-
Prepare the slab
Concrete is cleaned, repaired with compatible Ardex products, and all transitions are staged. Joint details are prepped to receive the membrane per the engineered spec.
-
Prime and seal
The matched Ardex primer is applied to bond the membrane to the substrate. The membrane follows (liquid-applied or sheet) at the specified thickness, with every corner, penetration, and edge detailed per protocol.
-
Protect and hand off
The protection layer (drainage board, screed, or traffic surface) is installed over the cured membrane. Warranty documentation is prepared and the waterproofing is ready for the next phase.
The critical detail
Corners and Penetrations Are Where Waterproofing Fails
Most waterproofing failures we investigate start at a joint, corner, or pipe penetration. The membrane field is typically fine; the transition is where water enters. Ardex provides engineered detail products and procedures for every transition type, and we install them per spec because that is where the system must hold.
If the substrate needs Ardex repair before membrane install, we handle that first. For larger projects involving foundation work or commercial flooring, the waterproofing integrates into the full scope.
Related Ardex services
Explore Other Ardex Products
Waterproofing is one part of the Ardex system family. See what else we offer.
Ardex Concrete Overlays
Ardex overlay systems for resurfacing tired concrete with a finished look.
Learn moreArdex Self-Leveling Underlayment
Ardex self-leveling underlayment to bring slabs flat for finish flooring.
Learn moreArdex Repair Mortars
Ardex repair mortar systems for crack, spall and damaged concrete restoration.
Learn moreArdex Certified Installer
Certified Ardex installer status, training and warranty support for Ardex systems.
Learn moreCommon questions
Ardex Waterproofing Questions, Answered
System types, joint details, protection layers and warranty.
Below-grade waterproofing on a foundation upgrade. Full Ardex system, every detail to spec, two springs of melt with the basement bone dry. Warranty documentation in our file. Real install.
Plaza deck waterproofing system on a commercial roof terrace. Membrane, drainage board, traffic surface, every layer per Ardex spec. Inspector signed off cleanly, no leak issues since.
Wet-room waterproofing for our locker rooms. Every joint, every penetration detailed per spec. Three years of daily wet operation, zero failures. The detail work is what matters.
They walked through the joint detail before install so we understood why it cost what it cost. The system has held; the up-front spec discussion was worth it.
From the blog
Concrete Guides & Articles
Practical reading on planning, finishes and caring for concrete in Las Vegas.
Ready to protect
Get Your Free Ardex Waterproofing Quote
Describe the application (basement, plaza deck, wet room), the area size, and the project timeline. We will specify the right Ardex system and send a written quote within one business day.
Free written estimate with firm schedule and system specification.