Parking · Curb & Gutter
Machine-Formed Curb & Gutter for Las Vegas Lots
The edge of a parking lot is where drainage begins. We pour curb and gutter using slipform equipment for long straight runs and hand-formed techniques for transitions, drop-curbs, and curves. Every pour is staked to grade, sloped to catch basins, and tied to adjacent pavement or city streets. Free written estimate included.
- Slipform paver for continuous runs
- Hand-formed details and transitions
- Slope verified to catch basins
The gutter is the system
How Curb & Gutter Manages Lot Drainage
Curb and gutter form the boundary between the parking surface and the landscape, but their real job is moving water. The gutter pan slopes toward catch basins; the curb prevents vehicles from running off the edge and contains the water being channeled. Without proper slope, the gutter becomes a pond. With it, every storm drains cleanly.
Long straight runs around a lot perimeter are poured with a slipform paver, a machine that extrudes the concrete to the engineered cross-section while moving forward. Transitions at lot corners, intersections with other pavement, drop-curbs for accessible ramps, and any curved sections are hand-formed by crews who tie the hand-work seamlessly into the machine-formed sections. Both methods produce the same finished profile.
This approach integrates with our broader parking lot concrete work, our commercial sidewalk pours, and any ADA ramp details that need flush curb-cuts. Existing curb damage is handled through our parking lot repair service.
The pour sequence
Steps to Install Curb & Gutter in Las Vegas
-
Survey and stake the line
The curb alignment is set from the property survey and drainage plan. Elevations are marked at every transition, catch basin, and slope change. The staking confirms the line before any ground work begins.
-
Excavate and compact base
The subgrade is cut to depth, compacted, and a gravel base is placed and compacted again. The surface is brought to the elevation where the concrete pour will start.
-
Machine or hand-form the concrete
Long runs are poured with a slipform paver that extrudes the concrete to the cross-section while moving. Transitions, curves, and details are hand-formed and tied into the slipform sections.
-
Joint, cure, and finish
Control joints are tooled at engineered spacing. The concrete cures protected from weather. Tie-ins to the parking lot slab and any street pavement are detailed and finished cleanly.
Drainage is the detail
Why Slope Determines Gutter Performance
A gutter without slope is a trough that holds water through every freeze-thaw cycle. The slope from any point along the pan to the next catch basin must be steep enough to move water at peak flow without ponding. We monitor slope as the slipform paver moves, because even a small loss of grade creates low spots that fail in winter. After cure, we verify the drainage path works before signing off.
Coordination matters at every boundary. The curb meets the parking lot slab flush, the city street tie-in is poured to municipal spec and passes inspection, and any ADA ramp curb-cuts are detailed for compliance. The curb is the transition point between systems; it has to fit each one. Our parking services and broader commercial concrete work all coordinate through the curb detail.
Related parking work
Other Parking Services We Offer
Curb & gutter is one component of our parking concrete work. See the full range.
Parking Lot Concrete
Full-size parking lot pour, engineered for truck loads, jointed and drained for the Las Vegas climate.
Learn moreParking Lot Repair
Patch, mill, or overlay failing sections instead of complete lot replacement.
Learn moreParking Structure
Multi-level parking structure concrete, engineered for live load and protected from salt and chlorides.
Learn moreCommon questions
Curb & Gutter Questions Answered
Slipform vs hand-formed, slope verification, city tie-ins, and repair options.
Long slipform run around our entire lot perimeter. Continuous, sharp edges, exact slope to the catch basins. The drainage works perfectly through every melt.
Hand-formed transitions at every entrance look like part of the design, not patched-in. They coordinated the curb pour with the asphalt apron so the meeting line is invisible.
City tie-in passed inspection first time. They knew the city's spec, poured to it, and the inspector signed off without revisions. Saved real schedule slip.
Drop-curbs at every accessible ramp tied in flush. ADA inspector confirmed compliance. The detail work shows; nothing improvised, everything to spec.
From the blog
Concrete Guides & Articles
Practical reading on planning, finishes and caring for concrete in Las Vegas.
Ready to start
Get Your Curb & Gutter Quote
Provide the run length, any city tie-in requirements, and the drainage path, and we will assess and send a written quote within one business day.
We assess the curb work and send a written quote within one business day.