Las Vegas Food-Grade Epoxy Flooring Built for Inspection
Production slabs in Las Vegas food facilities take scalding wash-down water, lactic and citric acid spills, caustic sanitizers, and federal inspector scrutiny. Las Vegas Concrete installs urethane cement and food-rated epoxy systems with seamless cove base that satisfy USDA and CFIA requirements. Free written estimate on every project.
- USDA/CFIA compliant systems
- Seamless with integrated cove
- Free written estimate, firm schedule
Compliance-driven
Why Food-Grade Epoxy Is a Separate Category of Floor
A production slab in a federally inspected facility is not just a floor that needs to be tough. It is a surface that regulators measure against specific criteria: no seams where bacteria can shelter, no wall-floor crevice that a mop cannot reach, resistance to the acids that drip from meat and dairy processing, and the ability to survive repeated hot caustic wash-down without delaminating. Standard commercial epoxy fails most of those tests before the first inspection.
Urethane cement is the material that meets the brief. It bonds tightly to the concrete slab, tolerates the thermal shock when 180-degree wash water hits a cold floor, and holds up against the lactic acid, citric acid, and caustic soda combinations that cycle through a food plant daily. The cove base detail, troweled monolithically up the wall to the required height, closes the gap that standard base trim leaves open. Las Vegas Concrete installs the full system, including the Sika and BASF product lines rated for food contact, with documentation built for your compliance file from the first day of production.
See how this floor fits into the broader USDA/CFIA compliant flooring program, review the coved base flooring systems detail, or compare the chemistry with chemical-resistant flooring used in adjacent non-food zones. Product specs are listed under Sika floor systems.
How it works
From Slab Assessment to Food-Grade Floor Handoff in Las Vegas
-
Audit the slab and the spec
Before any grinding starts, we walk the production floor with the plant's food safety lead. We record the applicable compliance standard (USDA, CFIA, or facility-specific), map the wash-down chemistry zone by zone, note the acids and caustics in rotation, and confirm the cove base height the inspector will measure against.
-
Prepare the concrete surface
The existing slab is diamond-ground to the surface profile the urethane cement manufacturer requires for bond. Failed coatings, grease contamination, and surface laitance are removed completely. Cracks and spalled areas are filled with food-compatible repair mortar and allowed to cure before the coating system goes down.
-
Trowel urethane cement and cove
The urethane cement is hand-troweled across the floor at the specified thickness, then carried up each wall as a monolithic cove base to the required height. No separate trim piece, no seam at the transition. The result is a single continuous surface the cleaning crew can sanitize without chasing bacteria into corners.
-
Topcoat, cure, and hand off the file
A food-rated topcoat seals the finished surface. Cure time is observed before the zone returns to food contact. We deliver the complete documentation package: material data sheets, as-built cove dimensions, install method record, and the list of compatible cleaning chemicals for the maintenance protocol.
What inspectors look for
Audit-Ready Documentation for Every Food-Grade Install
When a federal inspector arrives at a Las Vegas food facility, the floor itself is only part of what gets reviewed. The inspector also asks for the material data sheet confirming the coating is rated for food contact, the install record showing the cove base was brought to the required height, and the maintenance protocol listing which cleaning chemicals are compatible with the system. Facilities that cannot produce that paperwork on the spot face findings even when the floor looks fine.
Every food-grade epoxy project Las Vegas Concrete completes leaves the facility with a full compliance package assembled during the install, not assembled afterward. The file covers product specs, surface prep method, cove base as-built dimensions, cure schedule, and the approved cleaning chemical list. Your QA team can hand it to an inspector without searching for anything.
This documentation approach carries through to related work: the food processing program covers the full facility, BASF MasterTop floor systems are among the rated products we install, and the warehouse floor coating program handles distribution areas outside the food zone. Questions about cost? The concrete cost guide covers industrial floor pricing.
Other food processing services
Compare with Other Food Processing Services
Food-grade epoxy is one of three food processing services we offer. See the rest.
Common questions
Food-Grade Epoxy Questions, Answered
Compliance, wash-down chemistry, cove base and inspection documentation.
Urethane cement install across our production zones, USDA inspection passed first time with the documentation we had ready. The compliance side mattered as much as the install quality.
Cove base at every wall transition, seamless surface across the production floor. Disinfection takes less time, swab tests came back cleaner than before. Worth the right spec.
Phased install across our cells, production continued in the rest of the facility throughout. Each cell back to food contact on the cure schedule. Real coordination.
They knew the CFIA spec cold, installed accordingly, documentation supports our annual inspection. The expertise was specific to food, not generic industrial.
From the blog
Concrete Guides & Articles
Practical reading on planning, finishes and caring for concrete in Las Vegas.
Ready to start
Quote Your Las Vegas Food-Grade Epoxy Floor
Share the compliance standard your facility operates under, the production zones that need new flooring, and your next scheduled cleaning window. We will put together a written spec and price within one business day.
We'll assess the facility and send a written quote within one business day.