Driveways & Patios
Floors & Foundations
Floors & Flatwork
Sites & Facilities
Floors & Coatings
Facilities We Serve
BASF · MasterTop
Industrial MasterTop Floor Systems for Las Vegas Facilities
When a warehouse floor or manufacturing slab needs to handle traffic, chemicals, or temperature swings, MasterTop delivers the epoxy and urethane cement coating matched to the job. We install as a BASF-system contractor, following spec on every layer so your warranty is real.
- Epoxy + urethane cement range
- BASF-spec installation protocol
- System warranty on file
Product lineup
Where MasterTop Coatings Fit in Your Facility
The MasterTop line spans standard epoxy for light-to-moderate traffic zones, high-build epoxy for heavy forklift and equipment movement, and urethane cement for food processing, breweries, and chemical-exposure areas where thermal shock or aggressive solvents are part of the daily environment. The slab itself doesn't change, but the coating system does.
Installation follows the BASF protocol: substrate prep to profile, primer application, body coat at engineered thickness, topcoat, and cure documentation. Skipping steps or mixing products voids the warranty, so we follow the spec exactly. That discipline is what separates a system warranty from a product warranty.
Pair MasterTop with chemical-resistant flooring strategy, coordinate with MasterSeal moisture barriers if the slab has hydrostatic pressure, and integrate with our warehouse floor scope for joint filling and edge protection.
Installation sequence
How MasterTop Installation Unfolds in Las Vegas
-
Assess facility conditions and use
We walk the slab, document traffic patterns, chemical exposure, temperature swings, and slip requirements. This assessment determines which MasterTop system (standard epoxy, high-build, or urethane cement) is the right fit.
-
Prepare slab to BASF profile
The concrete is diamond-ground to remove contaminants and old coatings, cracks are repaired with BASF-compatible materials, and the surface is primed with the matched MasterTop primer coat.
-
Apply MasterTop system layers
Body coat is applied at the engineered thickness, aggregate is broadcast where specified, and topcoat is applied per the system spec. Each layer cures fully before the next begins.
-
Document and hand off
Material batch records, application thickness logs, and cure schedule are compiled and provided with the floor. The facility receives maintenance protocol and warranty documentation.
Why spec matters
BASF-Spec Installation Discipline Protects Your Floor
A MasterTop system warranty is only valid when installed by a BASF-certified contractor following BASF specifications for prep, primer, body coat thickness, cure time, and topcoat. Substituting materials, applying at the wrong thickness, or rushing cure voids the warranty. We follow the protocol because that is what makes the warranty enforceable.
Integrate MasterTop with the rest of your manufacturing floor strategy, including joint filling and edge protection. Coordinate with other BASF services on your project for a cohesive system approach.
Related BASF products
Explore Other BASF Solutions
MasterTop is one part of the BASF concrete system. See what else we offer.
Frequently asked
MasterTop Questions Answered
System selection, urethane cement, warranty scope, and phased installation.
MasterTop urethane cement in our chemical exposure zone. Three years of operation, no degradation, BASF warranty in our file. The brand discipline pays off.
High-build MasterTop across our warehouse zones. Forklift traffic for two years, no spalling at the joints, no surface wear. Right system for the use.
BASF-spec install with documentation. The system warranty paperwork came at handoff, supporting our facility records and any future audit need.
They matched the MasterTop system per zone in our multi-use facility instead of one system everywhere. Better outcomes, smaller total cost. Real engineering match.
From the blog
Concrete Guides & Articles
Practical reading on planning, finishes and caring for concrete in Las Vegas.
Next step
Get Your MasterTop Floor Quote
Describe your facility use, zone layout, and any special requirements. We will recommend the matched MasterTop system and provide a written quote with schedule.
Written quote delivered within one business day of site assessment.