Driveways & Patios
Floors & Foundations
Floors & Flatwork
Sites & Facilities
Floors & Coatings
Facilities We Serve
Foundations · Underpinning
Extend Shallow Footings with Foundation Underpinning
Footings that were never sized for today's load, or soil that shifted, or a basement you want to deepen. Las Vegas Concrete extends the footing downward or outward in engineered bays, keeping the building supported the whole time. Free assessment, written quote, firm schedule.
- Structural engineer designs sequence
- Building load supported through every bay
- Free assessment, written quote
Footing vs. wall
Underpinning Solves Footing Problems That Repair Cannot
A cracked wall can be reinforced. A footing that is too shallow or too narrow cannot. When the root cause is the footing itself, not deep enough, not wide enough, or sitting on poor bearing soil, the footing has to be extended or rebuilt. That is underpinning.
Three common scenarios call for underpinning. First, ongoing settlement after repair attempts, which signals the footing is moving, not the wall. Second, basement deepening, where lowering the floor below the existing footing requires the footing to be extended downward in bays first. Third, additions that load the existing footing beyond its original design capacity.
The work is engineered, sequenced in numbered bays, and pairs with crack sealing on newly exposed concrete. We also handle basement renovation that follows underpinning, and waterproofing on the newly exposed wall before backfill.
The sequence
How Foundation Underpinning Gets Done in Las Vegas
-
Structural engineer designs the work
The engineer specifies footing depth, width, materials, reinforcement, and the exact bay sequence so the building stays supported while each section is excavated and poured.
-
Excavate the first bay
The first bay in the sequence is dug out to the engineered depth, never adjacent bays at once. The rest of the footing holds the load while this section is open.
-
Form, reinforce, and pour concrete
The new footing section is formed, rebar placed, and concrete poured to the engineered detail. The concrete is allowed to cure fully before the next bay is touched.
-
Move to the next bay in sequence
Once the first bay is cured and load-bearing, the next bay in the sequence is excavated and poured. The cycle repeats until the entire footing is extended to the new depth or width.
Why sequence matters
Bays Are the Safety Mechanism in Underpinning
Underpinning the whole footing at once would collapse the building. Bays prevent that. Only a small percentage of the footing is unsupported at any time, and the rest is bearing the load while that bay cures. The engineered sequence determines which bay goes first, which goes second, and so on.
Skipping ahead, doing two adjacent bays simultaneously, or filling before proper curing time risks settlement during the work. We follow the sequence exactly as engineered, and we pair the work with proper footing installation detail. The newly exposed wall gets structural assessment before backfill, and we coordinate with any basement floor work that follows.
Related foundation work
Other Foundation Services We Offer
Underpinning is one of five foundation services. See how they compare.
Foundation Installation
New footings and walls formed, reinforced and poured to drawing for new construction and additions.
Learn moreFoundation Repair
Structural repair that stops movement, settlement or bowing in existing walls.
Learn moreFoundation Waterproofing
Exterior waterproofing and weeping tile that keep groundwater out and basements dry.
Learn moreFoundation Crack Repair
Sealing and injecting cracks early, before water and frost can work them wider.
Learn moreCommon questions
Underpinning Questions, Answered
Bay sequence, basement deepening, additions and when underpinning is the right tool.
We added a second storey and the engineer said underpin. Las Vegas Concrete did the sequence by the book, addition went on top, no settlement since. Done right.
Settlement that two other contractors had tried to fix as wall cracks was actually a footing problem. Underpinning solved it. Cracks haven't moved since.
Basement deepening project, underpinning first, then the new lower slab. Headroom we wanted, structure stronger than before. Worth every cent.
Engineered, sequenced, communicated every step. Lived in the house through the whole project, never felt unsafe. Underpinning is a craft and these guys know it.
From the blog
Concrete Guides & Articles
Practical reading on planning, finishes and caring for concrete in Las Vegas.
Next step
Get a Free Foundation Assessment
Tell us what is happening with the footing, settlement, an addition, or basement deepening, and we will assess it free and provide a written quote with the full underpinning sequence and timeline.
We'll assess the footing and send a written quote within one business day.