Skip to main content
Las Vegas & area concrete contractor · Free written estimates
(725) 900-7371

EV Battery · Clean Room

ISO Clean Room Flooring in Las Vegas

Particle control starts at the floor. A standard concrete slab sheds microscopic debris under foot traffic and equipment movement, contaminating the air stream and pushing your ISO class out of spec. We install seamless epoxy and urethane systems engineered to hold particles in place, eliminate off-gas chemistry, and integrate grounding where ESD dissipation is required. Free written estimate on every project.

  • Seamless, particle-verified install
  • Low off-gas chemistry for sensitive processes
  • ESD grounding integrated where needed

The particle problem

Why Seamless Flooring Matters in Clean Rooms

ISO clean room ratings depend on particle count per cubic meter of air. Every surface in the room contributes to that count. A porous or textured concrete floor continuously releases particles under traffic, equipment wheels, and air circulation. A sealed seamless floor system holds those particles in place and keeps the room within its particle budget.

We specify and install smooth epoxy or urethane systems matched to your ISO class requirement, with chemistry verified for low off-gas at operating temperature. The slab is prepped to the system's profile, cracks are sealed with compatible materials, and the finish is applied without seams or transitions across the room footprint. Grounding is integrated where ESD control is part of your process specification.

Our approach aligns with the broader EV battery flooring work across your facility and connects to ESD-controlled manufacturing floors in adjacent non-clean zones. Transitions between clean and non-clean areas are detailed to maintain the floor's integrity at the boundary.

Recent work
seamless clean room floor in a Las Vegas EV battery facility
particle verification testing on finished clean room concrete

Installation sequence

How Clean Room Flooring Gets Installed

  1. Determine ISO class and material spec

    We identify the target ISO class, the particle budget the floor contributes to, any ESD or grounding requirements, and the material chemistry that meets your process off-gas limits.

  2. Prepare slab in controlled conditions

    The concrete slab is prepped using HEPA-filtered or contained methods to avoid contaminating adjacent spaces, ground to the system profile, and any cracks filled with clean-room-compatible repair materials.

  3. Apply seamless epoxy or urethane

    The smooth seamless system is applied across the room footprint without seams, with the topcoat matched to the particle-shed and off-gas specs your process requires.

  4. Test, verify, and document

    After cure, particle count verification confirms the floor meets the budget, ESD testing (where required) confirms resistance range, and certification documentation supports your clean room commissioning file.

Critical detail

How Floor Transitions Determine Success

A perfect seamless floor across the room can fail at the transitions. The wall-floor junction, the doorway to a non-clean space, the pipe or cable penetrations, the equipment pad edges. These are where particles escape and where the room's ISO rating breaks. We detail every transition with seamless cove base, sealed penetrations, and integrated door frames so the floor's clean integrity extends to the room boundary.

Coordinate with EV battery facility services and with chemical-resistant flooring in adjacent production zones that share the same slab.

Request clean room quote
clean room floor with seamless transition detail and ISO verification documentation
Seamless Room to boundary
Verified Particle + ESD tested
Free Written quote

Related EV battery services

Explore Other EV Battery Flooring

Clean room is one of two specialized EV battery floor systems we install. See the other.

All EV battery services

Common questions

Clean Room Floor Questions, Answered

ISO class, particle budget, off-gas chemistry and transition details.

Multiple classes from less strict to more strict, with the floor system spec matched to the class. We confirm the target class up front and select the matched system; higher classes require lower-particulate materials and stricter install discipline.
Yes, significantly. A standard floor sheds particles continuously; a properly specified clean-room floor contributes far less. In an ISO-rated environment, every surface counts toward the particle budget.
Floor systems can off-gas trace chemistry that contaminates sensitive processes. We use chemistry rated for low off-gas in clean room applications, verified by the manufacturer for your specific class requirement.
Yes, transitions are where most clean room floors fail. We detail every transition (wall, door, penetration) with seamless cove and sealed integration so the floor's clean integrity holds at the room boundary.
Per room, typically a week or more depending on size and ISO class. The cure window before clean room commissioning adds additional time. The full schedule is in the quote and built around your commissioning calendar.

Client reviews

What Las Vegas Facilities Say About Their Clean Room Floors

★★★★★ 4.9 · 87 reviews on Google
Read all reviews →
★★★★★

ISO-class verified at commissioning with our floor as part of the particle budget. Hit class, room ran first try. The seamless transition detail at the door made the difference.

Z. J5
Clean Room Operations, Las Vegas
★★★★★

Off-gas verification on the floor chemistry for our sensitive process. No detectable contamination at the production analytical limit. Spec matched the process requirement exactly.

Y. J5
Process Engineer, Henderson
★★★★★

Multiple clean rooms across our facility, each at different ISO classes. They specced per room rather than one system everywhere; class targets hit in every room first commissioning.

Q. J5
Facility Engineer, Boulder City
★★★★★

Documentation package supported the validation file. Material specs, install method, particle verification all included. Auditor signed off without revisions.

X. J5
Validation Lead, North Las Vegas

Ready to start

Get a Free Clean Room Floor Quote

Provide the ISO class, room dimensions, and your commissioning timeline, and we will specify the matched system and deliver a written quote.

We assess the space and send a written quote within one business day.